This winter, our team from the DniproWay and Gallery_Dnepr channels ventured down into Shaft 12 of the Dnipro Metro construction site.
The shaft is located above the Teatralnaya station bypass tunnel; according to the original plan, it was to become a ventilation shaft, but under the new plan it will either be backfilled or become a ventilation shaft.
The tunnelling work took place in the early to mid-2000s (we found dates of 2004 and 2006 on the tunnel segments manufactured at DZMO), but the project was quickly abandoned due to a lack of funds.
This section served as a bypass tunnel for transport and an assembly chamber for tunnelling equipment, and the increased tunnel diameter is precisely what is needed to facilitate the installation of the equipment.